You are here: Home / Incredible India / Reviews / Life Republic – Kolte Patil, Hinjewadi [booked Feb 2012, No possession Feb 2017]

Life Republic – Kolte Patil, Hinjewadi [booked Feb 2012, No possession Feb 2017]

By Mahesh 37 Comments | Last Updated July 17, 2021

Feb 2017 Update

Last three months, they called me for Final Inspection and Poession.

Each time I went and pointed out major quality issues in my flat. Each time they called me without verification that issues raised in first visit are recolved and like a stupid I need to point out the same mistakes !

So last re-re-inspection done in W1 Feb, again they promised me to do things, however they will not be able to fix things like

  • Tile level mismatch all over the flat – Permanent error, they are unable to correct it
  • Tiles broken – Replaced by tiles with colour/texture mismatch – Permanent error, they are unable to correct it
  • Bedroom wooden tiles making noise while walk in some areas – Permanent error, they are unable to correct it
  • Sliding glass door jam – They may trey to resolve it
  • Cracks in walls visible – Permanent error, they are unable to correct it
  • Grouting non-uniform – They may try to correct
  • Entry door bottom patti re-fitted, however it is done in pathetic way (Roadside person also does better quality job) – Since they have changed it (previous one was cracked), they will not change again (although looks pathetic), they will try and patch-up
  • Building rest parts are unfinished, but they may take an year to correct as per them

Overall build quality is third class. even small builders in my area delivers higher quality than Kolte Patil Builders. Looks like they do not have capable persons who can look into Quality and Time.

Nov 2016 Update

Last Four weeks I am waiting for payments slips for submission to my bank to clear off last installment, first two weeks Kolte patil people were busy in Diwali Holidays, Now last two weeks their accountants are on leave. So I shall wait for couple of months more to get my slips and clear the dues.

There is list of Quality issues given one and half months back to them, which also they have to clear !!!

Kolte Patil, most un-trusted brand and poor customer care. Please do not buy from this builder at all.

Oct 2016 Update

After followup and shout, got intimation from them for my flat inspection. Today I went there and saw my flat is done on priority ! Almost all things done okay, few leakages, unfinished door, open wooden tiles etc indicated to that person, they have promised to get it done in next week and handover my flat !!! Hope for the best !! But I could see that many people has got possession and started staying inside.

Sept 2016 Update

No response from Sanjiva Mudada (Head – CRM Operations) & Soumitra too. Not responding to mails as well as SMS sent !! I am seriously thinking of going to Consumer Court now.

They are offering Referral scheme of 50,000 Rs to 5 Lac Rupees !! Whoever avails this offer will put his referral in trouble !! Because as seen they will take money and will not give possession for years !! So beware of such schemes from Kolte Patil Builders [Pune]

July 2016 Update

Again I called up Sanjiva Mudada (Head – CRM Operations), this time I found little improvement that he immediately replied to my SMS and second day i.e. 15 July 16 I got call from Soumitra that he will discuss and comeback on possession date. On 16 July 16 I again got call from Soumitra that they are trying best to provide possession in August 2016 !! Hey Almighty God please provide them strength (and money) to handover my flat !!!

June 2016 Update

After repeat followup, last message got on 28th June from Soumitra that they are trying best to provide possession in July 2016 !! God please provide them strength (and money) to handover my flat !!!

April 2016 update

Tried so hard to talk to six people from different departments from sales and PRO but they are so clever that they keep the ball tossing !! I talked to Sanjiva Mudada (Head – CRM Operations)
, Yogesh Salunke, someone from sales helpline, Abhay Suryawanshi, Soumitra Pattnaik .. all of them promised me to give possession next month ! which they are promising since last one year. I talked  Sanjiva Mudada (Head – CRM Operations) for half an hour to get process to cancel the flat, but he did not guide me, he said you have to calculate the amount of refund on your own and they will not be able to provide any such information to me !!!

Also when I visited my flat on 15th April 2016 I found that work of building and my flat is incomplete .. even electrical wiring not done, tiles not fitted properly (poor quality) some of tiles not fitted !!

I feel so sorry to get along this builder !!! Do not recommend to go with M/s Kolte patil builders for this bad experience.

Update as on 01 March 2016 for Life Republic issue

No confirmation on possession of my flat which I booked in Feb 2012 and paid 95% amount last year !
Customer care executive do not give any written commitment at all !! They even do not pick calls ! this too after paying half crore amount !!!
Update as on 01 Sept 2015
After calling Mr. Deepak, he said may be they will be able to give possession in Jan 2016, but he was not ready to provide it in writing even on email. Till today I have not got any written confirmation from Kolte Patil Builders about when they are in position to provide me possession.
Please note all the money is already paid and theoretical possession was in March 2015 ! Refer to my prediction two years back about their capability to deliver such big project !!! I had doubt at that time only !! Now I have paid complete amount so can’t help !!!

Update as on 27 June 2015

After REPEAT FOLLOWUP with Mr. Deepak, I could fetch out the following official reply (he was not ready to put things on paper !! and told me that he can not provide any update !!! when I asked him that I have paid 95% amount wherein Kolte Patil Builders at least should be able to provide update on when I can get possession !!!! as per comitment it was March 2015 !! then reluctantly after repeat followup this is what they have replied !!

Again see below reply no sense of comitment on date from Kolte Patil Builders ( Life Republic Hinjewadi) aka Kolte-Patil I-Ven Townships(Pune) Ltd.

we have almost completed the possession for R2 sector , and started the possession for R6 & R7 sector , Also  We are yet to receive the occupancy certificate for R4 sector , we will inform you as soon as we receive it.

NOT RECOMMENDED TO GO WITH KOLTE PATIL BUILDER AT ALL – Review of Kolte patil builder Life Republic project based on my own experience of buying flat there and wasting money.



Update as on 23 May 2015
Called up Mr. Deepak Jadhav to know status of possession which was due i March 2015.
I had sent 3 emails to him and Sarita madam of life republic and no reply was given by them on the same regarding status of project.
After calling Deepak JAdhav (Life Republic) he told that possession will happen somewhere September 2015 means about 6 months delay in possession and no information available to customers in writing !!! I asked him why he did not reply to may emails on which he told that he can not give this to me in writing ! so I asked him why he has not called me at least and given update, on which he told me that he will answer to those customers who will call him !!!
I think this clearly tells attitude from Kolte Patil Builder people !! once you pay them they do not bother about you !!!
Again do not go with this builder at all.update as on 14 Sept 2014 14/9/14 (after nice telecon with the executive for request of looking at my own flat & paying 95% amount):C wind 22 floor completed,i have paid 95% amount.
I think after spending lot of money I have came to a conclusion not to go ahead with this builder in my lifetime.If you are buying the flat = Office is open, you will be entertained well !You have already bought the flat with Kolte Patil ? then face the music

  • you are not allowed to take photograph alongwith your family in front of the construction !! They say we are sending photos to you and photograph with family in front of the scheme is not permitted !!
  • Progress of construction can not be seen due to the reasons that work is in progress ! and on Sundays when work is stopped, they say manpower is not available hence you can not see the flat, hence after 95% payment done I have not seen my flat !!
  • if you wish to see the construction on Sundays you need to take prior permission and walk up 22 floors to see the flat !! the executives are kind enough to say that they will also walk alonwith ?? (they know no one can climb 22 floors on Sundays !!!!)
  • When they send demand letter, the shown photographs is of finished one with architect certificate on it so that your bank pays the amount, when I cross checked today 20./9/14, found that it is half finished, bathrooms are not tiled at all !! where as architect certificate shows that flooring complete !! so that now I have paid ~95% amount and flat is in unfinished state !!!
  • I bought the flat due to the Brand Name ! but ….
  • I did not find the quality of construction to that extent, cracks were seen !! tiles matching not perfect !! very low quality work indeed.
  • if you wish to buy flat from any builder i recommend going to mouthshut and check review of Kolte patil builder for their projects !!

latest photographs of completion !! of my flat ?(remember ~95% amount paid)

Sector 4 – status as on sept 2014

life republic marunji 2014

View from 22nd floor sector 4 as on sept 2014

life republic kolte patil

SEactor 4 – ~95% payment done !! see the status of flat !! I don’t believe them

kolte patil builders review

Bathroom status as on sept 2014, architect certificate shows flooring complete ! obviously flooring of bathroom does not come into their official architect certificate !! making fools of customers !! making them pay 95% amount of flat.

incomplete construction by kolte patil builder

life republic marunji incomplete work

kolte patil builders review

update as on 31/12/2013 ( December 2013) -the C wing 18th floor is complete

you can see the road junction is ready ..looks beautiful …. it is said that the movie “mangalashtak once more” shooting was done at life republic hinjewadi.

entrance to life republic hinjewadi

the city has started taking its shape by the sky scrappers roaring high .. bungalows are almost ready and they are now showing it to the owners .. for the flat owners they shall start it by next quarter or so … feeling so good 🙂

Update 15/5/2013

Anisha Global School buildings work in May 2013 at Life republic Hinjewadi project
This is future school modelled on  the successful Singapore system, spread across 7 acres !
I think they are really driving the project towards a future 🙂
may be one day your child will be part of such school 🙂

 

Buildings progress at life republic hinjewadi project in may 2013, work till 9th floor done !

Update 15 December  2012
A high tech and futuristic school worth 35 crore will be functional in academic year 2013-14 in Life-republic 🙂
yes, they are launching Anisha Global school (AGS) which will be based on the CBSE digital curriculum empowered by Marshall Cavendish Online from KG to 12th. AGS will be having a campus spanning ~7 acres ! with surprising low fees ~60000 per annum !! once done with this project they shall start AGS scholls at Kharadi and NIBM Pune.

Update 1 Aug 12 – project progress is satisfactory (on schedule at least for my building)

loan approval status from different banks is as under(as on 1 Aug 2012)

All schemes in life republic, hinjewadi approved by  ICICI Bank & India bulls
SBI has approved R2, R4, R6, R7
HDFC, AXIS bank & LIC  has approved R2, R7

Update 15 May 2012 –
by the way you must note that at Life Republic, they provide only one parking (even you want to buy more you can not ?) its funny to me … such a huge township … people with 2 BHK costing ~55 lacs … and they think one will have single car at home ! NEVER ….. but no use … they think you should not spend more money on car ,,, but may be walk around for kilometers to maintain your health …. i think this decision of the township planned is completely wrong … since most of the people staying there wuld be from software park .. and with both husband/wife working  … most of them wuld have at least two cars …. and to my surprise they have not planned for this … they could have fetched more money out of selling parking to the owners … didn’t they ?

Update 07 May 2012 –
Life Republic Hinjewadi by Kolte Patil, this project is not still approved by SBI for home loan, they informed me in January 2012  that they will get approval in 15 days, after 5 months !!! still they do not have approval from SBI !!!

Update W4 April –
The registration office is at Paud ! and there is good amount of rush, say Life republic people book ~21 persons in a day, so you need to be there early morning 9.30 am, so as to wrap as soon as possible, also at Paud there is no good hotels around, so do not get along with kids there, nothing to play with and need to wait for at least 2~3 hours. so better to carry some packed food for you (drinking water u can buy from local shop or carry, since they sell local brand water bottles)

Udapte 15 April 2012 –
Life republic construction site visited on 15 April 2012, progress on the same is in below photograph
honestly it is not great as compared to the one seen in month of Feb 2012, if one looks at the scope of the project, this speed will definitely not help ! this is my first cut judgement based on my own experience in industry. they must speed up and synchronize at this time only else they will surely miss the targets ..
the possession of flats they are claiming t o be in 2015, which means they must hurry, but let’s see since the technology the will be using is to build from ready made slabs …

the office building where bookings are done … as on now it is maintained well …
view of booking office site …
In front of booking office in Feb 2012

This Sunday I visited the Life Republic – Kolte Patil, Marunji Hinjewadi and find it facinating …

The kind of facilities they have thought of are the best one has thought of …

you must visit the actual site to see the progress …

the bungalow construction is in progress as on now.

Till now the schemes open are almost 95% sold out ! and further avenues will be open with higher rate per square foot. Last week the rate hiked by 100 Rs psf, so now minimum rate is 3500 Rs psf till 5th floor, after that rate hike of 25 rs psf per floor is applicable, so if you want to buy 22nd floor you need to pay Rs 425 psf more ! (but it may be worth in my opinion)

but believe me, if things go as they have shown, this will be best place to live in India (as you know Pimpri Chinchwad has already won “Best city in India” award for 2011-2012)

you must see the video they have published on their website

Cheers … I am impressed hence I will post more photos since I am planning to visit the site again for my friend.

Filed Under: Reviews Tagged With: shopping

Comments

  1. Pankaj Negi says

    September 27, 2013 at 12:10 pm

    Very Good Information About Kolte Patil Life Republic
    For More Info About
    Kolte Patil

    Reply
  2. Pankaj Negi says

    March 11, 2014 at 7:35 am

    Kolte Patil Group, a well known builder of Pune, Proudly announced new residential Project Life Republic in Hinjewadi Pune.

    Reply
  3. prashant says

    February 24, 2016 at 6:57 pm

    I also paid 95% of amount still flat not handover to me. Now they are saying it will in month of March-16. Pdahake2001@gmail.com

    Reply
  4. Sumit says

    March 2, 2016 at 7:43 pm

    HI mahesh,

    Did you get the possession or it got delayed again ?

    Reply
    • Mahesh says

      March 2, 2016 at 8:01 pm

      No… Don’t know when I will get possession… They are not ready to commit in writing…

      Reply
      • Bala says

        March 17, 2016 at 3:55 pm

        Hi Mahesh,

        Is your flat in R4 sector ?

        Reply
      • Sumit says

        April 28, 2016 at 2:36 am

        Are you still waiting ?

        Reply
        • Mahesh says

          April 29, 2016 at 9:32 pm

          yes .. trying to cancel the flat as per aggrement .. but they are not telling procedure & amount refund .. I talked to about six people from different department but they just keep on bouncing the ball to each other … totally unreliable builder I would say

          Reply
  5. Amit says

    May 17, 2016 at 1:08 pm

    Kolte Patil dev. is just a big Fraud, I am regretting my purchase here in Life Republic. not got the Possession yet after 2 years of Delay, and the quality is the worst in the world. Please Do not buy anything from this builder.

    Reply
  6. manoj mishra says

    July 17, 2016 at 2:57 pm

    I was given a deadline for possession on 2015 but yet as of today 17th July not received possession. Please inform me remedy. I have been paying huge interest to bank.

    Reply
    • manoj mishra says

      July 17, 2016 at 3:00 pm

      Are they going to pay interest @11% for the delay?

      Reply
      • Mahesh says

        July 17, 2016 at 3:05 pm

        I am trying .. but looks like we have to fight in consumer court only ..

        Reply
        • Sumit says

          September 22, 2016 at 11:43 pm

          Is it Still same ?

          Reply
          • Mahesh says

            September 23, 2016 at 7:20 am

            Yes.. Now looking like worsen… Sumit not answering mails

        • RITESH KUMAR says

          August 1, 2017 at 4:40 pm

          I have similar situation here….Booked a flat in R3 sector expected to get the flat last year but they are delaying it again, received a call which was not atall convincing that they will provide by Oct-Nov2017, Can we do somthing together. I am fedup with them.

          Reply
  7. Nikhil says

    August 22, 2016 at 11:59 pm

    Hey Mahesh,
    I am in the same boat as you. Booked a flat in R4 and have just been asked to take possession. But the delays have been so long, that we are now entitled to compensation. The compensation amount should be almost equal to the final 5%.
    I have decided to hold off on taking possession of the flat, till they do not take a decision on what compensation they will pay out. Last weekend they told me that management has not taken a decision yet, and compensation will be payed out later. I do not buy it, cause once they have the final amount from us, we can kiss the remainder good bye. I am ready to take legal action in consumer court. Let me know what your plans are.

    Reply
  8. Kushal Parikh says

    August 31, 2016 at 1:23 am

    Hi All,

    Have bought a flat in R4, and was suppose to get the possession in Dec’15. However no update yet on possession and no proper response given by customer care. Not sure what’s happening. I just happen to read the reviews and all looks so negative.

    Reply
  9. Neel says

    September 10, 2016 at 9:53 pm

    As an NRI customer they wanted me to invest and when I did I am now having horrible experience with my investment at R4 in Life Republic. They just keep on providing me with new dates and promises which are never kept. They want me to take possession when there are serious issues in the flat which need to be fixed. The CRM team is horrible and worst is Soumitra who has absolutely no courtesy and manners on how to deal with customer. Horrible experience, cannot trust this builder anymore, I am already telling my NRI investors, friends and NRI community forums not to invest with these untrustworthy people. I think all people who are part of Life Republic should come together and hire a good lawyer and take them to court. I know things don’t work as they do in US but we still need to try and teach them a lesson as they have taken everyone for granted

    Reply
  10. Sumit says

    October 13, 2016 at 9:34 pm

    Congrats…. Please share some latest pictures. Thanks

    Reply
  11. yogesh says

    November 17, 2016 at 12:48 pm

    Hello,
    Did you get possession of your flat. If yes then please share your experience.

    Reply
    • Mahesh says

      November 17, 2016 at 12:59 pm

      No … Still I am struggling to get possession .. very poor customer support from Kolte Patil … unfortunately they just say verbally that customer care is improved but actions do not speak at all .. I am waiting to get some duplicate money receipts since two weeks .. may take couple of weeks more .. so just money receipts printing takes 4 weeks from Kolte Patil accounts team !!! just crap …

      Reply
      • Yogesh says

        January 6, 2017 at 12:01 pm

        Hello Mahesh,

        Did issues related to possession sorted out or you still chasing them for corrections ?

        Reply
        • Mahesh says

          January 6, 2017 at 7:07 pm

          Nothing done by them… Pathetic… Situation as it is

          Reply
          • Sumit says

            February 3, 2017 at 9:26 am

            Hello Sir… Whats the status for possession now ?? Did you get it by any chance ??

          • Mahesh says

            February 3, 2017 at 10:44 am

            I have updated the post with issues faced, looks like they do not have capable persons who understands simple english. I went third time to check my flat and all quality issues remained as it is ! even after confirmation by them that things are done !! anyway I may get possession in 2017 (hope so)

  12. Ameya Vanjari says

    December 18, 2016 at 11:43 pm

    Hi Mahesh,

    Landed on your page while searching for issues with kolte patil life Republic r7/c. As i read through your blogs, i could see exactly what i have gone through. I’ve just today handed a list of snags they would fix in a week or so.

    I’ve few questions:
    Have they fixed your list of issues?
    Have u taken the possession?
    Given the delay, any compensation?

    Eagerly waiting to hear…

    Reply
    • Mahesh says

      December 19, 2016 at 11:11 am

      They have not taken any action on detailed report given to them on Quality issues faced with my flat !! on visit Ritesh Deshmukh confirmed that all things are done, however when I visited flat found that nothing is done !! in face I found more issues like tiles cracked, main entrance granite crack, windows jam, tiles leveling, door locks not operating at all etc. which shows POOR quality as well as irresponsible people just telling that things are done !! So I have denied the possession till corrections are done.
      There is not single word of compensation by them
      Also as a big joke they wanted me to sign a paper where it was written that I am happy customer and they can use my name & details in their ads etc !! ha ! ha !! what a daring !!!

      Reply
  13. Sumit says

    March 31, 2017 at 12:53 am

    Any update on this, Sir ??

    Reply
  14. Vinod says

    April 8, 2017 at 5:16 pm

    Hi all,
    I am in same boat. Booked flat in 2012 and still waiting for possession.

    We shall not let builder cheat and fool us.

    Can we all meet and go to consumer court together and get our hard earned money back ?

    I think we will lose stamp duty , service tax, VAT, registration. However cheat Kolte Patil will have to pay us interest which shall compensate it.

    Never ever purchase anything from Kolte Patil.

    Regards,
    Vinod

    Reply
  15. SK says

    May 2, 2017 at 4:06 pm

    If you all are so keen, let us all meet on a weekend with a lawyer or at a police station and file a complaint. Now that RERA is in picture, we will not only get the possession but a very good compensation as well. In Maharashtra, even an FIR works for such complaints against builders. I’m sure, you will get more than 12% interest on the value of your property for the time of the delay (~ approx. 6 lacs per year on 50 lacs cost of flat) and also compensation towards mental agony.

    Reply
  16. Roopesh says

    May 13, 2017 at 12:07 am

    I am from R4 E building. I too am facing same problem. No communication as yet on possession. Action needs to be taken. Builder needs to compensate us for the long delay in providing possession which was Dec 2015 as per agreement. Also the flat should be provided with good quality specifications.

    Reply
  17. Sumit Kukkar says

    May 15, 2017 at 9:27 pm

    Hi Mahesh, I am following your blog on Life Republic for a long time now. You must be knowing about Ravi Karandeekar. He is famous for writing blogs about pune real estate. I have asked him to raise LP possession issue on his blog. But he need some actual flat owners for Video interview. I have shared your blog with him and he is impressed too. So are you up to meet Ravi for Video interview ? Please let me know. Regards

    Reply
    • Mahesh says

      May 15, 2017 at 9:30 pm

      Thanks for the info, unfortunately I am out of station for this month.

      Reply
  18. Vasant says

    June 15, 2017 at 8:02 pm

    My son has booked a flat in A Building of R4 sector and he has faced similar issues of delay of possession quality and workmanship
    Their CRM department takes long time to attend the checklist jobs and when they call again to visit we find many jobs still not attended. I think it is delaying tactic by them so that the flat owner will get frustrated and take the possession as he is loosing interest on investment amount and rental income/rent.
    The best way is to form a group and fight together for common issues. Please let me know if already such group for R4 sector flat owners is formed so that he can join

    Reply
  19. Pritam says

    June 24, 2017 at 4:25 pm

    Let me know I will also come with you to file the consumer compliant. Please let me know

    Reply
  20. Sumit says

    August 9, 2017 at 9:18 pm

    Hello Sir.. did you get possession ??

    Thanks.

    Reply
  21. Roopesh Rangdale says

    August 11, 2017 at 10:21 am

    Hi, I took possession in July in R4 sector. E building.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Book a Test Ride Today

Royal Enfield Test Ride 2025 120-600.jpg

Our site is hosted on Hostinger

Get Mega Discount on Hosting

Contact me

Contact Mahesh
About me

Good Read

Places in Pune
Backpack list - India
Travel Pack - India
Swiss from India

Archives

Interesting buy

Best Tent

We at Wikipedia

Where on Wiki ?

Copyright © 2025 ·TrekBook India

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish.Accept Reject Read More
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
Go to mobile version